Nabiax data center in Alcalá de Henares
Nabiax data center in Alcalá de Henares is an operational data center operated by Nabiax in Alcalá de Henares, Spain. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Nabiax |
| Facility power | 14 MW (range 6.9 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,484 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.51892, -3.34178 |
| Website | nabiax.com/nuestros-data-centers/espana/alcala-data-center |
Power and grid
| Nearest high-voltage substation | SET Alcalá II, 132 kV, 2.1 km away (Unión Fenosa Distribución) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación de Meco, 220 kV, 3.4 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 164 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 623 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Nabiax data center in Alcalá de Henares use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How close is Nabiax data center in Alcalá de Henares to the power grid?
The nearest high-voltage substation in OpenStreetMap is SET Alcalá II (132 kV), about 2.1 km away.
How clean is the power for Nabiax data center in Alcalá de Henares?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates Nabiax data center in Alcalá de Henares?
Nabiax.
Data centers near Alcalá de Henares
- TecnoAlcalá 83 m
- Adam - MAD 547 m
- Pure DC Madrid Meco (MAD01) 2.8 km · 4.5 MW
- Iron Mountain Data Center - Madrid (MAD-1) 14.9 km
- Microsoft MAD01 19.4 km · 10 MW
- IPCore Datacenter Madrid 20.9 km
- Verizon Madrid 21.2 km
- Cogent Madrid 22.9 km
More Nabiax data centers
- N1 Spain
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.