N1
N1 is an operational data center operated by Nabiax in Simancas, Spain. Our footprint estimate of its power is about 5.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Nabiax |
| Facility power | 5.8 MW (range 2.9 MW to 9.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,874 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | N2 · N3 |
| Coordinates | 40.43322, -3.62935 |
| Website | nabiax.com/nuestros-data-centers/espana/julian-camarillo |
Power and grid
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 623 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does N1 use?
We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.
How clean is the power for N1?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates N1?
Nabiax.
Data centers near Simancas
- Digital Realty Madrid MAD3 452 m · 4 MW
- Digital Realty Madrid MAD4 636 m · 9.7 MW
- Templus DC Madrid MAD03 820 m
- IaaS Datacenter Madrid 846 m
- iaas data center in San Blas-Canillejas 936 m · 1.2 MW
- Digital Realty Madrid MAD1-2 967 m · 4.3 MW
- Cantabria Datacenter 4.3 km
- Espanix Datacenter 4.5 km
More Nabiax data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.