iaas data center in San Blas-Canillejas
iaas data center in San Blas-Canillejas is an operational data center operated by iaas in San Blas-Canillejas, Spain. Our footprint estimate of its power is about 1.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | iaas |
| Facility power | 1.2 MW (range 0.6 MW to 1.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 995 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 510 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Calle de la Maratón 12 |
| Coordinates | 40.44026, -3.62329 |
Power and grid
| Nearest high-voltage substation | Subestación de Canillejas, 220 kV, 1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 23 |
| Power plants within 50 km | 99 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 623 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does iaas data center in San Blas-Canillejas use?
We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.
How close is iaas data center in San Blas-Canillejas to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación de Canillejas (220 kV), about 1 km away.
How clean is the power for iaas data center in San Blas-Canillejas?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates iaas data center in San Blas-Canillejas?
iaas.
Data centers near San Blas-Canillejas
- IaaS Datacenter Madrid 97 m
- Templus DC Madrid MAD03 161 m
- Digital Realty Madrid MAD1-2 204 m · 4.3 MW
- Digital Realty Madrid MAD4 542 m · 9.7 MW
- Digital Realty Madrid MAD3 711 m · 4 MW
- N1 936 m · 5.8 MW
- Cantabria Datacenter 4.1 km
- Verizon Madrid 4.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.