Digital Realty Madrid MAD3

Digital Realty Madrid MAD3 is an operational data center operated by Digital Realty in Madrid, Spain. Our footprint estimate of its power is about 4 MW.

Key facts

StatusOperational
OperatorDigital Realty
Facility power4 MW (range 2 MW to 6.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,318 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks49 networks, 1 internet exchanges
PeeringDB.
Also known asMAD3
AddressCalle de Emilio Muñoz 49-51
Coordinates40.43390, -3.62408
Websitedigitalrealty.com/data-centers/madrid/49-calle-emilio-munoz-madrid-spain

Power and grid

Nearest high-voltage substationUnnamed substation, 220 kV, 800 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km22
Power plants within 50 km99 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity154 g CO₂ per kWh (Spain, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6%
Industrial power priceEUR 0.105 per kWh (Spain, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.9 °C (2001 to 2025)
Cooling degree days623 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.7 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayHigh (40-80%) (Spain)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Digital Realty Madrid MAD3 use?

We estimate the facility power at about 4 MW. Estimate from building footprint, low confidence.

How close is Digital Realty Madrid MAD3 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 800 m away.

How clean is the power for Digital Realty Madrid MAD3?

The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.

Who operates Digital Realty Madrid MAD3?

Digital Realty.

Data centers near Madrid

More Digital Realty data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.