LDeX 1
LDeX 1 is an operational data center operated by LDeX in Cricklewood, United Kingdom. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | LDeX |
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,650 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.56819, -0.23085 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 2.1 km away (London Underground) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 4.3 km away |
| HV substations within 10 km | 38 |
| Power plants within 50 km | 3.3 GW in 105 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does LDeX 1 use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
How close is LDeX 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 2.1 km away.
How clean is the power for LDeX 1?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates LDeX 1?
LDeX.
Data centers near Cricklewood
- LDeX1 122 m
- Pure DC London Brent Cross 515 m · 18 MW
- Options IT - Park Royal Datacenter (PRDC) 4.3 km · 1.2 MW
- Vantage LHR2 4.4 km · 5.2 MW
- Colt London West 4.4 km · 6 MW
- Equinix LD9 - London, Powergate 4.6 km · 16 MW
- Data center in Harlesden 4.8 km · 23 MW
- Vantage Data Centers LHR1 4.8 km · 9.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.