Vision247 - Chiswick Datacenter
Vision247 - Chiswick Datacenter is an operational data center operated by Vision247 in London, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Vision247 |
| Address | 566, Chiswick High Road |
| Coordinates | 51.49473, -0.27479 |
| Website | vision247.com |
Power and grid
| Nearest high-voltage substation | Ealing Substation, 275 kV, 1.7 km away (National Grid Electricity Transmission) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 30 |
| Power plants within 50 km | 2.9 GW in 95 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Vision247 - Chiswick Datacenter to the power grid?
The nearest high-voltage substation in OpenStreetMap is Ealing Substation (275 kV), about 1.7 km away.
How clean is the power for Vision247 - Chiswick Datacenter?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Vision247 - Chiswick Datacenter?
Vision247.
Data centers near London
- Vision 247 89 m
- Redwire 3.2 km
- Equinix LD3 - London, Park Royal 3.8 km · 4.1 MW
- Data center in Acton 3.8 km · 6.2 MW
- Vantage Data Centers LHR1 3.9 km · 9.3 MW
- Data center in Harlesden 4.0 km · 23 MW
- Equinix LD9 - London, Powergate 4.2 km · 16 MW
- Colt London West 4.3 km · 6 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.