Westelcom Networks Plattsburgh
Westelcom Networks Plattsburgh is an operational data center operated by Westelcom Networks in Plattsburgh, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Westelcom Networks |
| Networks | 1 networks PeeringDB. |
| Address | 24 Margaret Street |
| Coordinates | 44.69643, -73.45294 |
| Website | www2.westelcom.com/?page_id=322 |
Power and grid
| Utility | City Of Plattsburgh (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | NYIS |
| Nearest gas pipeline | North Country Pipeline Co, interstate pipeline, 1.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 6.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.6 °C (2001 to 2025) |
| Cooling degree days | 176 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.53 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Westelcom Networks Plattsburgh?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates Westelcom Networks Plattsburgh?
Westelcom Networks.
Data centers near Plattsburgh
- SoVerNet Burlington 30.7 km
- Consolidated - 266 Main St. 31.2 km
- Tech Vault South Burlington 36.5 km
- Lightboard ⭑ Vermont 36.7 km
- OVHcloud, Centre de données de Beauharnois 76.4 km · 53 MW
- Root Data Center MTL-R1 83.9 km
- eStruxture MTL-2 85.8 km
- Cologix MTL2 86.0 km
More Westelcom Networks data centers
- Westelcom Networks Watertown United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.