Consolidated - 266 Main St.
Consolidated - 266 Main St. is an operational data center operated by Consolidated Communications in Burlington, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Consolidated Communications |
| Networks | 1 networks PeeringDB. |
| Address | 266 Main St. |
| Coordinates | 44.47650, -73.20858 |
| Website | consolidated.com |
Power and grid
| Nearest high-voltage substation | East Avenue Substation, 115 kV, 1.6 km away (Vermont Electric Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Plattsburgh Substation, 230 kV, 38.7 km away |
| HV substations within 10 km | 9 |
| Utility | City Of Burlington Electric (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Vermont Gas System, interstate pipeline, 1.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 579 MW in 45 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 61 g CO₂ per kWh (Vermont, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 48.6%, solar 19.4%, bioenergy 16.6%, wind 15.5%. Clean power: 99.9% |
| Industrial power price | USD 0.127 per kWh (Vermont, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 6.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.4 °C (2001 to 2025) |
| Cooling degree days | 222 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.47 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low (<10%) (Vermont) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Consolidated - 266 Main St. to the power grid?
The nearest high-voltage substation in OpenStreetMap is East Avenue Substation (115 kV), about 1.6 km away. The local utility is City Of Burlington Electric, in the ISNE balancing area.
How clean is the power for Consolidated - 266 Main St.?
The grid in Vermont emits about 61 g CO₂ per kWh (2025). Largest sources: hydro 48.6%, solar 19.4%, bioenergy 16.6%.
Who operates Consolidated - 266 Main St.?
Consolidated Communications.
Data centers near Burlington
- SoVerNet Burlington 501 m
- Lightboard ⭑ Vermont 5.8 km
- Tech Vault South Burlington 5.9 km
- Westelcom Networks Plattsburgh 31.2 km
- VELCO Rutland 92.4 km
More Consolidated Communications data centers
- Consolidated - 45 Forest Ave. United States
- Consolidated - 770 Elm St. United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.