Consolidated - 45 Forest Ave.
Consolidated - 45 Forest Ave. is an operational data center operated by Consolidated Communications in Portland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Consolidated Communications |
| Networks | 1 networks PeeringDB. |
| Address | 45 Forest Ave |
| Coordinates | 43.65601, -70.26380 |
| Website | consolidated.com |
Power and grid
| Nearest high-voltage substation | Cape Steam Substation, 115 kV, 1.6 km away (Central Maine Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | South Gorham Substation, 345 kV, 13.6 km away |
| HV substations within 10 km | 10 |
| Utility | Central Maine Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Northern Utilities (ME), intrastate pipeline, 5.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.9 GW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 244 g CO₂ per kWh (Maine, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.4%, solar 17.9%, wind 17.8%, hydro 16.3%, bioenergy 10.8%. Clean power: 62.7% |
| Industrial power price | USD 0.142 per kWh (Maine, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35 °C (2001 to 2025) |
| Cooling degree days | 209 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.76 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low (<10%) (Maine) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Consolidated - 45 Forest Ave. to the power grid?
The nearest high-voltage substation in OpenStreetMap is Cape Steam Substation (115 kV), about 1.6 km away. The local utility is Central Maine Power Co, in the ISNE balancing area.
How clean is the power for Consolidated - 45 Forest Ave.?
The grid in Maine emits about 244 g CO₂ per kWh (2025). Largest sources: gas 34.4%, solar 17.9%, wind 17.8%.
Who operates Consolidated - 45 Forest Ave.?
Consolidated Communications.
Data centers near Portland
- CENTRA PWM1 - Portland, Maine (340 Cumberland) 288 m
- FirstLight Regen Hut 2.9 km
- Oxford Networks 38.1 km · 11 MW
- FirstLight data center in Portsmouth 78.1 km · 1.8 MW
- University of New Hampshire data center in Durham 79.6 km · 4.2 MW
More Consolidated Communications data centers
- Consolidated - 266 Main St. United States
- Consolidated - 770 Elm St. United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.