Data Center Directory

FirstLight Regen Hut

FirstLight Regen Hut is an operational data center operated by NNENIX in Portland, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorNNENIX
Networks5 networks, 1 internet exchanges
PeeringDB.
Address9 Westland Avenue
Coordinates43.65807, -70.29982
Websitefirstlight.net/services/network/dark-fiber

Power and grid

Nearest high-voltage substationSewall Substation, 115 kV, 700 m away (Central Maine Power Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSouth Gorham Substation, 345 kV, 10.8 km away
HV substations within 10 km11
UtilityCentral Maine Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelineNorthern Utilities (ME), intrastate pipeline, 2.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.9 GW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity244 g CO₂ per kWh (Maine, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.4%, solar 17.9%, wind 17.8%, hydro 16.3%, bioenergy 10.8%. Clean power: 62.7%
Industrial power priceUSD 0.142 per kWh (Maine, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35 °C (2001 to 2025)
Cooling degree days209 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.76 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow (<10%) (Maine)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is FirstLight Regen Hut to the power grid?

The nearest high-voltage substation in OpenStreetMap is Sewall Substation (115 kV), about 700 m away. The local utility is Central Maine Power Co, in the ISNE balancing area.

How clean is the power for FirstLight Regen Hut?

The grid in Maine emits about 244 g CO₂ per kWh (2025). Largest sources: gas 34.4%, solar 17.9%, wind 17.8%.

Who operates FirstLight Regen Hut?

NNENIX.

Data centers near Portland

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.