Data Center Directory

Oxford Networks

Oxford Networks is an operational data center operated by FirstLight in Brunswick, United States. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorFirstLight
Facility power11 MW (range 5.6 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,261 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressResilient Circle 14, 04011, Brunswick
Coordinates43.89516, -69.92343
Websitefirstlight.net/products/data-center/brunswick-me-data-center

Power and grid

Nearest high-voltage substationTopsham Substation, 115 kV, 6.3 km away (Central Maine Power Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMaine Yankee 345kV Substation, 345 kV, 19.4 km away
HV substations within 10 km2
UtilityCentral Maine Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelineMaritimes & Northeast PL US, interstate pipeline, 21 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.8 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity244 g CO₂ per kWh (Maine, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.4%, solar 17.9%, wind 17.8%, hydro 16.3%, bioenergy 10.8%. Clean power: 62.7%
Industrial power priceUSD 0.142 per kWh (Maine, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature7.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.4 °C (2001 to 2025)
Cooling degree days205 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.7 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayLow (<10%) (Maine)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Oxford Networks use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is Oxford Networks to the power grid?

The nearest high-voltage substation in OpenStreetMap is Topsham Substation (115 kV), about 6.3 km away. The local utility is Central Maine Power Co, in the ISNE balancing area.

How clean is the power for Oxford Networks?

The grid in Maine emits about 244 g CO₂ per kWh (2025). Largest sources: gas 34.4%, solar 17.9%, wind 17.8%.

Who operates Oxford Networks?

FirstLight.

Data centers near Brunswick

More FirstLight data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.