123.NET - DC1 - 24700 Northwestern Hwy.
123.NET - DC1 - 24700 Northwestern Hwy. is an operational data center operated by 123.Net in Southfield, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | 123.Net |
| Networks | 63 networks, 3 internet exchanges PeeringDB. |
| Also known as | ManagedWay SFJ1 · Subrigo DET11 |
| Address | 24700 Northwestern Hwy. |
| Coordinates | 42.47163, -83.23806 |
| Website | 123.net |
Power and grid
| Nearest high-voltage substation | Northwest Substation, 120 kV, 3.2 km away (Detroit Edision) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Warren Substation, 230 kV, 15.1 km away |
| HV substations within 10 km | 15 |
| Utility | Dte Electric Company (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Michcon Gas Co, intrastate pipeline, 6.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.3 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 455 g CO₂ per kWh (Michigan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5% |
| Industrial power price | USD 0.090 per kWh (Michigan, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 351 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Michigan) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is 123.NET - DC1 - 24700 Northwestern Hwy. to the power grid?
The nearest high-voltage substation in OpenStreetMap is Northwest Substation (120 kV), about 3.2 km away. The local utility is Dte Electric Company, in the MISO balancing area.
How clean is the power for 123.NET - DC1 - 24700 Northwestern Hwy.?
The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.
Who operates 123.NET - DC1 - 24700 Northwestern Hwy.?
123.Net.
Data centers near Southfield
- ManagedWay SFJ2 571 m
- 365 Data Centers Detroit (DT1) 1.8 km
- EdgeConneX Detroit (EDCDET01) 3.2 km · 6.5 MW
- Liberty Center One 8.5 km · 2.4 MW
- ManagedWay TYM1 13.5 km
- ManagedWay TYM2 13.8 km
- Verizon Wireless data center in Detroit 20.9 km · 4.6 MW
- Quicken Loans data center in Detroit 21.3 km · 7.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.