Data Center Directory

2Connect DC10

2Connect DC10 is an operational data center operated by One Hungary Ltd._12301 in Budapest, Hungary. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorOne Hungary Ltd._12301
Networks14 networks, 1 internet exchanges
PeeringDB.
AddressKozma utca 2.
Coordinates47.48550, 19.17929
Website2connect.com/data-centre

Power and grid

Grid carbon intensity162 g CO₂ per kWh (Hungary, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 40.1%, solar 27.1%, gas 20.3%, bioenergy 6%, coal 3.3%. Clean power: 75.4%
Industrial power priceEUR 0.176 per kWh (Hungary, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40 °C (2001 to 2025)
Cooling degree days392 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.48 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayLow (<10%) (Budapest)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for 2Connect DC10?

The grid in Hungary emits about 162 g CO₂ per kWh (2025). Largest sources: nuclear 40.1%, solar 27.1%, gas 20.3%.

Who operates 2Connect DC10?

One Hungary Ltd._12301.

Data centers near Budapest

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.