Invitech DC14
Invitech DC14 is an operational data center operated by Invitech Megoldások Zrt. in Budapest, Hungary. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Invitech Megoldások Zrt. |
| Address | Ilka utca 31, 1143, Budapest |
| Coordinates | 47.50880, 19.09801 |
Power and grid
| Grid carbon intensity | 162 g CO₂ per kWh (Hungary, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 40.1%, solar 27.1%, gas 20.3%, bioenergy 6%, coal 3.3%. Clean power: 75.4% |
| Industrial power price | EUR 0.176 per kWh (Hungary, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40 °C (2001 to 2025) |
| Cooling degree days | 392 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.48 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Low (<10%) (Budapest) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Invitech DC14?
The grid in Hungary emits about 162 g CO₂ per kWh (2025). Largest sources: nuclear 40.1%, solar 27.1%, gas 20.3%.
Who operates Invitech DC14?
Invitech Megoldások Zrt..
Data centers near Budapest
- Magyar Telekom Cloud & DataCenter 1.7 km · 44 MW
- DoclerNet 2.0 km
- ATW data center in Budapest 3.1 km
- BIX Building (Victor Hugo street) 3.3 km
- Belügyminisztérium Nyilvántartások Vezetéséért Felelős Helyettes Államtitkárság 3.7 km · 2.4 MW
- Drávanet Zrt. data center in Budapest 5.3 km
- Hauszmann adatközpont 6.1 km · 5.2 MW
- VIVAnet DC 6.3 km
More Invitech Megoldások Zrt. data centers
- Invitech DC10 Hungary
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.