4 Data Center
4 Data Center is an operational data center operated by Quicktel Sp. z o.o. in Katowice, Poland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Quicktel Sp. z o.o. |
| Networks | 286 networks, 7 internet exchanges PeeringDB. |
| Also known as | Quicktel Sp. z o.o. |
| Address | Adamskiego 7 |
| Coordinates | 50.25361, 19.00312 |
| Website | 4datacenter.com |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110kV „Baildon”, 110 kV, 1.3 km away (Tauron) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 220/110/6kV „SE Katowice”, 220 kV, 3.8 km away |
| HV substations within 10 km | 55 |
| Power plants within 50 km | 7.0 GW in 32 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.8 °C (2001 to 2025) |
| Cooling degree days | 193 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is 4 Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110kV „Baildon” (110 kV), about 1.3 km away.
How clean is the power for 4 Data Center?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates 4 Data Center?
Quicktel Sp. z o.o..
Data centers near Katowice
- ATMAN Data Center Katowice-1 (KTW-1, Altus) 1.8 km
- Orange Polska // Katowice 1.8 km
- PLAY Centrum Danych DC2 4.4 km · 1.4 MW
- PSE Jordana 11.7 km
- Debacom Zabrze DC1 16.9 km
- Netia Jaworzno (JAWOH001) 18.7 km
- Toszecka 101 25.2 km
- Data center in Trzebinia 35.4 km · 2.8 MW
Sources