Toszecka 101
Toszecka 101 is an operational data center operated by KOPnet S.C. Marek Szczudlo Juliusz Kostrzewski in Gliwice, Poland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | KOPnet S.C. Marek Szczudlo Juliusz Kostrzewski |
| Networks | 3 networks PeeringDB. |
| Address | Toszecka 101 |
| Coordinates | 50.31840, 18.66364 |
| Website | gix.com.pl |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/20/6kV „GPZ Myśliwska”, 110 kV, 500 m away (Tauron) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 400/110kV „SE Rokitnica”, 400 kV, 9.3 km away |
| HV substations within 10 km | 23 |
| Power plants within 50 km | 6.8 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.8 °C (2001 to 2025) |
| Cooling degree days | 193 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Toszecka 101 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/20/6kV „GPZ Myśliwska” (110 kV), about 500 m away.
How clean is the power for Toszecka 101?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates Toszecka 101?
KOPnet S.C. Marek Szczudlo Juliusz Kostrzewski.
Data centers near Gliwice
- Debacom Zabrze DC1 8.6 km
- PSE Jordana 13.6 km
- 4 Data Center 25.2 km
- ATMAN Data Center Katowice-1 (KTW-1, Altus) 26.4 km
- Orange Polska // Katowice 26.9 km
- PLAY Centrum Danych DC2 29.6 km · 1.4 MW
- Netia Jaworzno (JAWOH001) 43.9 km
- Data center in Trzebinia 60.6 km · 2.8 MW