Data center in Trzebinia

Data center in Trzebinia is an operational data center in Trzebinia, Poland. Our footprint estimate of its power is about 2.8 MW.

Key facts

StatusOperational
Facility power2.8 MW (range 1.4 MW to 4.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 583 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWiśniowa 7, 32-540, Trzebinia
Coordinates50.15855, 19.47775

Power and grid

Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Trzebinia use?

We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Trzebinia?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.