Polcom Alwernia Datacenter
Polcom Alwernia Datacenter is an operational data center operated by Polcom Sp. z o.o. in Grojec, Poland. Our footprint estimate of its power is about 1.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Polcom Sp. z o.o. |
| Facility power | 1.6 MW (range 0.8 MW to 2.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,352 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 680 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Polcom Data Center Alwernia |
| Address | Zamkowa 21 |
| Opened | 2015-12 |
| Coordinates | 50.09691, 19.55609 |
| Website | polcom.com.pl |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/30/15 kV „GPZ Alwernia”, 110 kV, 4.5 km away (Tauron) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 220/110kV „SE Siersza”, 220 kV, 14 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 5.8 GW in 32 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.9 °C (2001 to 2025) |
| Cooling degree days | 154 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Polcom Alwernia Datacenter use?
We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.
How close is Polcom Alwernia Datacenter to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/30/15 kV „GPZ Alwernia” (110 kV), about 4.5 km away.
How clean is the power for Polcom Alwernia Datacenter?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates Polcom Alwernia Datacenter?
Polcom Sp. z o.o..
Data centers near Grojec
- Data center in Trzebinia 8.8 km · 2.8 MW
- Polcom Skawina Datacenter 23.4 km · 3.5 MW
- S-NET KRAKOW DATA CENTER KRDC-1 24.9 km
- Netia Jaworzno (JAWOH001) 25.0 km
- AGH Cyfronet Athena 25.0 km · 0.3 MW
- AGH Cyfronet Helios 25.4 km · 0.5 MW
- WNET DC Krakow 25.6 km
- Netia Data Center SOUL 25.7 km
More Polcom Sp. z o.o. data centers
- Polcom Skawina Datacenter Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.