4421.io
4421.io is an operational data center operated by 4421.io in Everett, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | 4421.io |
| Coordinates | 47.95875, -122.19156 |
Power and grid
| Utility | Puget Sound Energy INC (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PSEI |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 10.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36 °C (2001 to 2025) |
| Cooling degree days | 56 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.51 kWh per m² per day |
| Wind at 50 m | 3 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for 4421.io?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates 4421.io?
4421.io.
Data centers near Everett
- EVRTWAXA - Everett Primary Central Office 4.9 km
- Norma Beach Cable Landing Station 12.5 km
- Centersquare Lynnwood SE1 15.4 km · 10 MW
- Digital Fortress (LYN) 16.8 km · 2.9 MW
- BOTHWAXB - Bothell Central Office 18.7 km
- Kanobe, LLC 19.9 km
- Comcast data center in Greenwood 31.0 km · 0.7 MW
- Colocation Northwest - Redmond 36.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.