Centersquare Lynnwood SE1 is an operational data center operated by Centersquare in Lynnwood, United States. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Facility power | 10 MW (range 5 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,353 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Highway 99 17300, 98037, Lynnwood |
| Coordinates | 47.84181, -122.30167 |
| Website | centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sno-King Substation, 500 kV, 9.2 km away |
| HV substations within 10 km | 6 |
| Utility | Puget Sound Energy INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PSEI |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 209 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.3 °C (2001 to 2025) |
| Cooling degree days | 73 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.48 kWh per m² per day |
| Wind at 50 m | 3 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centersquare Lynnwood SE1 use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How close is Centersquare Lynnwood SE1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.6 km away. The local utility is Puget Sound Energy INC, in the PSEI balancing area.
How clean is the power for Centersquare Lynnwood SE1?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Centersquare Lynnwood SE1?
Centersquare.
Data centers near Lynnwood
- Digital Fortress (LYN) 2.3 km · 2.9 MW
- Norma Beach Cable Landing Station 2.9 km
- BOTHWAXB - Bothell Central Office 9.4 km
- EVRTWAXA - Everett Primary Central Office 10.4 km
- Kanobe, LLC 10.8 km
- 4421.io 15.4 km
- Comcast data center in Greenwood 16.6 km · 0.7 MW
- Level(3) Seattle (Denny Way) 24.9 km · 30 MW
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.