ADV TALAR is an operational data center operated by Advantun in Buenos Aires, Argentina. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Advantun |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Address | Cnel. Vilela 3033 |
| Coordinates | -34.45699, -58.68856 |
| Website | advantun.com/wholesale/data-center |
Power and grid
| Grid carbon intensity | 345 g CO₂ per kWh (Argentina, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41% |
Climate and water
| Average temperature | 16.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 740 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.79 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Low (<10%) (Buenos Aires) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for ADV TALAR?
The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.
Who operates ADV TALAR?
Advantun.
Data centers near Buenos Aires
- Datacenter Telecom 1.3 km · 18 MW
- Pacheco Datacenter EZE1 Argentina Buenos Aires 2.9 km
- Datacenter 5.9 km
- ARSAT data center in Ingeniero Pablo Nogués 5.9 km · 5.3 MW
- ADV BENAVIDEZ 7.3 km
- Cabase NGB 9.8 km
- LINKEAR SRL 21.7 km
- BAEHOST-HQ 24.1 km
More Advantun data centers
- ADV BENAVIDEZ Argentina
- ADV ZARATE Argentina
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.