ARSAT data center in Ingeniero Pablo Nogués
ARSAT data center in Ingeniero Pablo Nogués is an operational data center operated by ARSAT in Ingeniero Pablo Nogués, Argentina. Our footprint estimate of its power is about 5.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ARSAT |
| Facility power | 5.3 MW (range 2.6 MW to 8.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,394 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -34.41037, -58.71980 |
Power and grid
| Nearest high-voltage substation | Subestación Tortuguitas, 132 kV, 6.7 km away (Edenor) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación Talar, 220 kV, 9.2 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 6.2 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 345 g CO₂ per kWh (Argentina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41% |
Climate and water
| Average temperature | 16.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 740 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.79 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Low (<10%) (Buenos Aires) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ARSAT data center in Ingeniero Pablo Nogués use?
We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.
How close is ARSAT data center in Ingeniero Pablo Nogués to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Tortuguitas (132 kV), about 6.7 km away.
How clean is the power for ARSAT data center in Ingeniero Pablo Nogués?
The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.
Who operates ARSAT data center in Ingeniero Pablo Nogués?
ARSAT.
Data centers near Ingeniero Pablo Nogués
- Datacenter 63 m
- ADV TALAR 5.9 km
- ADV BENAVIDEZ 6.4 km
- Datacenter Telecom 7.2 km · 18 MW
- Cabase NGB 8.0 km
- Pacheco Datacenter EZE1 Argentina Buenos Aires 8.8 km
- EdgeConneX Buenos Aires (EDCBUE01) 21.9 km
- LINKEAR SRL 25.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.