Datacenter Telecom
Datacenter Telecom is an operational data center operated by TELECOM ARGENTINA in Ricardo Rojas, Argentina. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TELECOM ARGENTINA |
| Facility power | 18 MW (range 8.8 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,645 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Colectora Este Panamericana 32375, Ricardo Rojas |
| Coordinates | -34.46734, -58.68196 |
Power and grid
| Grid carbon intensity | 345 g CO₂ per kWh (Argentina, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41% |
Climate and water
| Average temperature | 16.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 740 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.79 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Low (<10%) (Buenos Aires) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter Telecom use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How clean is the power for Datacenter Telecom?
The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.
Who operates Datacenter Telecom?
TELECOM ARGENTINA.
Data centers near Ricardo Rojas
- ADV TALAR 1.3 km
- Pacheco Datacenter EZE1 Argentina Buenos Aires 1.8 km
- Datacenter 7.2 km
- ARSAT data center in Ingeniero Pablo Nogués 7.2 km · 5.3 MW
- ADV BENAVIDEZ 8.1 km
- Cabase NGB 10.5 km
- LINKEAR SRL 20.9 km
- BAEHOST-HQ 23.0 km
More TELECOM ARGENTINA data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.