Aeven data center in Rødovre
Aeven data center in Rødovre is an operational data center operated by Aeven in Rødovre, Denmark. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Aeven |
| Facility power | 2 MW (range 1 MW to 3.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,675 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 55.69351, 12.41694 |
Power and grid
| Nearest high-voltage substation | 132kV Ejbygård, 132 kV, 1.4 km away (Energinet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Glentegård transformerstation, 400 kV, 8.3 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 2.2 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 120 g CO₂ per kWh (Denmark, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2% |
| Industrial power price | EUR 0.118 per kWh (Denmark, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.91 kWh per m² per day |
| Wind at 50 m | 7.6 m/s average |
| Water stress today | Low (<10%) (Denmark) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Aeven data center in Rødovre use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
How close is Aeven data center in Rødovre to the power grid?
The nearest high-voltage substation in OpenStreetMap is 132kV Ejbygård (132 kV), about 1.4 km away.
How clean is the power for Aeven data center in Rødovre?
The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.
Who operates Aeven data center in Rødovre?
Aeven.
Data centers near Rødovre
- GlobalConnect Glostrup 219 m · 2.5 MW
- Penta Infra Copenhagen CPH01 1.9 km
- atNorth DEN01 2.0 km
- Adeo Datacenter 4.2 km · 4.1 MW
- Norlys Telehouse Copenhagen 4.3 km
- Interxion CPH03 4.4 km · 5.9 MW
- GlobalConnect Albertslund (CPH3) 4.4 km
- Cibicom Datacenter Ballerup 4.4 km
Sources
Correct this page or get the data