GlobalConnect Glostrup
GlobalConnect Glostrup is an operational data center operated by GlobalConnect in Glostrup, Denmark. Our footprint estimate of its power is about 2.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | GlobalConnect |
| Facility power | 2.5 MW (range 1.2 MW to 3.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,048 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks PeeringDB. |
| Address | Ejby Industrivej 1 |
| Coordinates | 55.69373, 12.42041 |
| Website | globalconnect.dk/tjenester/datacenter |
Power and grid
| Grid carbon intensity | 120 g CO₂ per kWh (Denmark, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2% |
| Industrial power price | EUR 0.118 per kWh (Denmark, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.91 kWh per m² per day |
| Wind at 50 m | 7.6 m/s average |
| Water stress today | Low (<10%) (Denmark) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does GlobalConnect Glostrup use?
We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.
How clean is the power for GlobalConnect Glostrup?
The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.
Who operates GlobalConnect Glostrup?
GlobalConnect.
Data centers near Glostrup
- Aeven data center in Rødovre 219 m · 2 MW
- atNorth DEN01 2.0 km
- Penta Infra Copenhagen CPH01 2.0 km
- Adeo Datacenter 4.4 km · 4.1 MW
- Norlys Telehouse Copenhagen 4.5 km
- Interxion CPH03 4.5 km · 5.9 MW
- Cibicom Datacenter Ballerup 4.5 km
- GlobalConnect Albertslund (CPH3) 4.5 km
More GlobalConnect data centers
- GlobalConnect Taastrup 1 (CPH1) Denmark
- GC-FAB7 Stavanger Norway
- GlobalConnect Albertslund (CPH3) Denmark
- GlobalConnect Gothenburg Sweden
- GlobalConnect Hamburg (HAM1) Germany
- GlobalConnect Hørning 2 Denmark
- GlobalConnect Järfälla Sweden
- GlobalConnect Kolding Denmark
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.