Adeo Datacenter is an operational data center operated by Adeo DC ApS in Albertslund, Denmark. Our footprint estimate of its power is about 4.1 MW.

Key facts

StatusOperational
OperatorAdeo DC ApS
Facility power4.1 MW (range 2 MW to 6.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,382 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks7 networks
PeeringDB.
Also known asAdeo Datacenter ApS
Addressherstedvang 8
Coordinates55.66773, 12.36782
Websiteadeodc.com

Power and grid

Grid carbon intensity120 g CO₂ per kWh (Denmark, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2%
Industrial power priceEUR 0.118 per kWh (Denmark, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30 °C (2001 to 2025)
Cooling degree days44 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.91 kWh per m² per day
Wind at 50 m7.6 m/s average
Water stress todayLow (<10%) (Denmark)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Adeo Datacenter use?

We estimate the facility power at about 4.1 MW. Estimate from building footprint, low confidence.

How clean is the power for Adeo Datacenter?

The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.

Who operates Adeo Datacenter?

Adeo DC ApS.

Data centers near Albertslund

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.