AIMS Kuala Lumpur
AIMS Kuala Lumpur is an operational data center operated by AIMS Data Centre Sdn Bhd in Kuala Lumpur, Malaysia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | AIMS Data Centre Sdn Bhd |
| Networks | 103 networks, 6 internet exchanges PeeringDB. |
| Also known as | AIMS Kuala Lumpur 2 |
| Address | Ground Floor, Menara AIMS, Changkat Raja Chulan |
| Coordinates | 3.14969, 101.70634 |
| Website | aims.com.my |
Power and grid
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 3,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Kuala Lumpur) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for AIMS Kuala Lumpur?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Who operates AIMS Kuala Lumpur?
AIMS Data Centre Sdn Bhd.
Data centers near Kuala Lumpur
- Alibaba Cloud in Malaysia 1.4 km
- MAF War Gaming Simulation Center 3.8 km
- SAFEHOUSE Data Centre 6.2 km
- TM ONE, Plaza VADS 8.5 km
- NEXTDC Kuala Lumpur Data Centre (KL1) 10.6 km · 6.5 MW
- Data center in Bukit Jalil 10.6 km · 2.8 MW
- JARING Bukit Jalil 11.6 km
- MY03 11.7 km
More AIMS Data Centre Sdn Bhd data centers
- AIMS Bangkok 44 N Sathon Rd Thailand
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.