NEXTDC Kuala Lumpur Data Centre (KL1)
NEXTDC Kuala Lumpur Data Centre (KL1) is an operational data center operated by NEXTDC Sdn Bhd in Petaling Jaya, Malaysia. Our footprint estimate of its power is about 6.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC Sdn Bhd |
| Facility power | 6.5 MW (range 2.6 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 54,277 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 3.09443, 101.62884 |
| Website | nextdc.com/data-centres/malaysia-data-centres-colocation |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 1 km away (Tenaga Nasional) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 3.8 km away |
| HV substations within 10 km | 27 |
| Power plants within 50 km | 4.8 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 3,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Selangor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEXTDC Kuala Lumpur Data Centre (KL1) use?
We estimate the facility power at about 6.5 MW. Estimate from building footprint, low confidence.
How close is NEXTDC Kuala Lumpur Data Centre (KL1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1 km away.
How clean is the power for NEXTDC Kuala Lumpur Data Centre (KL1)?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Who operates NEXTDC Kuala Lumpur Data Centre (KL1)?
NEXTDC Sdn Bhd.
Data centers near Petaling Jaya
- TM ONE, Plaza VADS 5.0 km
- Basis Bay 5.5 km
- Data center in Bukit Jalil 6.2 km · 2.8 MW
- SAFEHOUSE Data Centre 8.4 km
- JARING Bukit Jalil 8.5 km
- MY03 9.0 km
- Alibaba Cloud in Malaysia 9.7 km
- AIMS Kuala Lumpur 10.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.