Data center in Bukit Jalil

Data center in Bukit Jalil is an operational data center in Bukit Jalil, Malaysia. Our footprint estimate of its power is about 2.8 MW.

Key facts

StatusOperational
Facility power2.8 MW (range 1.1 MW to 7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 23,463 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates3.06015, 101.67231

Power and grid

Nearest high-voltage substationUnnamed substation, 275 kV, 2 km away (Tenaga Nasional)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km23
Power plants within 50 km4.8 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.2 °C (2001 to 2025)
Cooling degree days3,495 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.8 kWh per m² per day
Wind at 50 m3.1 m/s average
Water stress todayLow (<10%) (Kuala Lumpur)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Bukit Jalil use?

We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.

How close is Data center in Bukit Jalil to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (275 kV), about 2 km away.

How clean is the power for Data center in Bukit Jalil?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.

Data centers near Bukit Jalil

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.