Akquinet NOR01
Akquinet NOR01 is an operational data center operated by akquinet outsourcing gGmbH in Norderstedt, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | akquinet outsourcing gGmbH |
| Networks | 3 networks PeeringDB. |
| Also known as | Rechenzentrum Akquinet |
| Address | Ulzburger Str. 201 |
| Coordinates | 53.70016, 9.99409 |
| Website | akquinet.com |
Power and grid
| Nearest high-voltage substation | Umspannwerk Norderstedt, 110 kV, 2 km away (Schleswig-Holstein Netz AG) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hamburg Nord, 380 kV, 4.6 km away |
| HV substations within 10 km | 14 |
| Power plants within 50 km | 1.1 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 70 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Schleswig-Holstein) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Akquinet NOR01 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Norderstedt (110 kV), about 2 km away.
How clean is the power for Akquinet NOR01?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Akquinet NOR01?
akquinet outsourcing gGmbH.
Data centers near Norderstedt
- Stadtwerke Norderstedt RZ1 673 m
- Equinix HH1 - Hamburg 6.3 km · 11 MW
- GlobalConnect Hamburg (HAM1) 7.0 km
- NTT Hamburg 1 Data Center (HAM1) 7.1 km
- AtlasEdge DC Hamburg HAM001 9.0 km
- Penta Infra Hamburg HAM01 9.0 km
- Akquinet HAM02 9.8 km
- Akquinet HAM01 10.0 km
More akquinet outsourcing gGmbH data centers
- Akquinet HAM01 Germany
- Akquinet HAM02 Germany
- Akquinet HAM03 Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.