NTT Hamburg 1 Data Center (HAM1)
NTT Hamburg 1 Data Center (HAM1) is an operational data center operated by NTT Global Data Centers in Hamburg, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Networks | 8 networks PeeringDB. |
| Address | Langenhorner Chaussee 40 |
| Coordinates | 53.63732, 10.01565 |
| Website | datacenter.hello.global.ntt/en/location/hamburg/hamburg-1-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 100 m away (Stromnetz Hamburg GmbH) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hamburg Nord, 380 kV, 11.8 km away |
| HV substations within 10 km | 26 |
| Power plants within 50 km | 1.1 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 70 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low (<10%) (Hamburg) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT Hamburg 1 Data Center (HAM1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 100 m away.
How clean is the power for NTT Hamburg 1 Data Center (HAM1)?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates NTT Hamburg 1 Data Center (HAM1)?
NTT Global Data Centers.
Data centers near Hamburg
- GlobalConnect Hamburg (HAM1) 157 m
- AtlasEdge DC Hamburg HAM001 2.2 km
- Penta Infra Hamburg HAM01 2.2 km
- Akquinet HAM02 2.7 km
- Equinix HH1 - Hamburg 2.8 km · 11 MW
- Akquinet HAM01 2.9 km
- Akquinet NOR01 7.1 km
- Stadtwerke Norderstedt RZ1 7.8 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.