Data Center Directory

AL NASR TYPING CENTER

AL NASR TYPING CENTER is an operational data center in UMM AL QUWAIN, United Arab Emirates. No power figure is public for this site yet.

Key facts

StatusOperational
AddressAL HAWIYAH 4, 473, UMM AL QUWAIN
Coordinates25.57800, 55.56057

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 10.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationAjman Grid Station, 400 kV, 25 km away
Power plants within 50 km4.0 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity470 g CO₂ per kWh (United Arab Emirates, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 68%, nuclear 21.2%, solar 9.9%. Clean power: 31.6%

Climate and water

Average temperature28.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature46.1 °C (2001 to 2025)
Cooling degree days3,911 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.67 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayExtremely High (>80%) (United Arab Emirates)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How close is AL NASR TYPING CENTER to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 10.1 km away.

How clean is the power for AL NASR TYPING CENTER?

The grid in United Arab Emirates emits about 470 g CO₂ per kWh (2025). Largest sources: gas 68%, nuclear 21.2%, solar 9.9%.

Data centers near UMM AL QUWAIN

Sources

Correct this page or get the data