AtlasEdge DC Leverkusen LEV001
AtlasEdge DC Leverkusen LEV001 is an operational data center operated by AtlasEdge in Leverkusen, Germany. Our footprint estimate of its power is about 3.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | AtlasEdge |
| Facility power | 3.4 MW (range 1.7 MW to 5.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,809 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Also known as | AtlasEdge |
| Address | Dornierstr. 10 |
| Opened | 2027 |
| Coordinates | 51.05862, 7.02014 |
| Website | atlasedge.com/data-centres/leverkusen |
Power and grid
| Nearest high-voltage substation | Station Küppersteg, 110 kV, 2.5 km away (Westnetz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Station Dhünnaue, 220 kV, 3.9 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 12 GW in 45 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.2 °C (2001 to 2025) |
| Cooling degree days | 142 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.96 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AtlasEdge DC Leverkusen LEV001 use?
We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.
How close is AtlasEdge DC Leverkusen LEV001 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Station Küppersteg (110 kV), about 2.5 km away.
How clean is the power for AtlasEdge DC Leverkusen LEV001?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates AtlasEdge DC Leverkusen LEV001?
AtlasEdge.
Data centers near Leverkusen
- ITENOS Leverkusen (LEV1) 76 m
- Surfplanet GmbH 9.2 km
- NetCologne data center in Köln 9.6 km · 4.2 MW
- euNetworks Colocation Koeln 13.9 km
- Penta Infra Cologne CGN01 13.9 km
- EXA Edge DC Hilden 14.2 km
- nLighten Dusseldorf DUS1 14.3 km
- AtlasEdge DC Düsseldorf DUS001 15.8 km · 12 MW
More AtlasEdge data centers
- AtlasEdge DC Berlin BER001 Germany
- AtlasEdge DC Düsseldorf DUS001 Germany
- AtlasEdge DC Brussels BRU001 Belgium
- AtlasEdge DC Hamburg HAM001 Germany
- AtlasEdge DC Hamburg HAM002 Germany
- AtlasEdge DC Lisbon LIS001 Portugal
- AtlasEdge DC Manchester MAN001 United Kingdom
- AtlasEdge DC Stuttgart GRP10 Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.