AtlasEdge DC Brussels BRU001
AtlasEdge DC Brussels BRU001 is an operational data center operated by AtlasEdge in Brussels, Belgium. Our footprint estimate of its power is about 8.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | AtlasEdge |
| Facility power | 8.5 MW (range 4.3 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,103 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks PeeringDB. |
| Also known as | BRU001 |
| Address | Mercuriusstraat 30, Nossegem |
| Coordinates | 50.87203, 4.50363 |
| Website | atlasedge.com/data-centres/brussels |
Power and grid
| Nearest high-voltage substation | Woluwe-Saint-Lambert - Sint-Lambrechts-Woluwe, 150 kV, 3.9 km away (Elia) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Station Verbrande Brug, 380 kV, 9.8 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 2.4 GW in 19 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 87 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AtlasEdge DC Brussels BRU001 use?
We estimate the facility power at about 8.5 MW. Estimate from building footprint, low confidence.
How close is AtlasEdge DC Brussels BRU001 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Woluwe-Saint-Lambert - Sint-Lambrechts-Woluwe (150 kV), about 3.9 km away.
How clean is the power for AtlasEdge DC Brussels BRU001?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates AtlasEdge DC Brussels BRU001?
AtlasEdge.
Data centers near Brussels
- Digital Realty BRU3 - Brussels 186 m · 4.9 MW
- Unix-Solutions DC Zaventem 458 m · 0.8 MW
- Mobistar Nossegem fka Versatel Nossegem 617 m
- EXA Edge DC Zaventem 1.1 km
- Digital Realty BRU1 - Brussels 1.9 km · 9.6 MW
- brusselsdc 3.6 km · 1.3 MW
- LCL Brussels (Diegem) 3.8 km
- MCI/Verizon Brussels (Diegem) E 4.0 km
More AtlasEdge data centers
- AtlasEdge DC Berlin BER001 Germany
- AtlasEdge DC Düsseldorf DUS001 Germany
- AtlasEdge DC Leverkusen LEV001 Germany
- AtlasEdge DC Hamburg HAM001 Germany
- AtlasEdge DC Hamburg HAM002 Germany
- AtlasEdge DC Lisbon LIS001 Portugal
- AtlasEdge DC Manchester MAN001 United Kingdom
- AtlasEdge DC Stuttgart GRP10 Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.