Unix-Solutions DC Zaventem
Unix-Solutions DC Zaventem is an operational data center operated by Unix-Solutions in Zaventem, Belgium. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Unix-Solutions |
| Facility power | 0.8 MW (range 0.4 MW to 1.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 687 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 13 networks, 2 internet exchanges PeeringDB. |
| Address | Hoge Wei 37 |
| Opened | 2013-06 |
| Coordinates | 50.87524, 4.49956 |
| Website | datacenters.unix-solutions.be/zaventem |
Power and grid
| Nearest high-voltage substation | Woluwe-Saint-Lambert - Sint-Lambrechts-Woluwe, 150 kV, 3.9 km away (Elia) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Station Verbrande Brug, 380 kV, 9.4 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 2.0 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 87 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Unix-Solutions DC Zaventem use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Unix-Solutions DC Zaventem to the power grid?
The nearest high-voltage substation in OpenStreetMap is Woluwe-Saint-Lambert - Sint-Lambrechts-Woluwe (150 kV), about 3.9 km away.
How clean is the power for Unix-Solutions DC Zaventem?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates Unix-Solutions DC Zaventem?
Unix-Solutions.
Data centers near Zaventem
- Digital Realty BRU3 - Brussels 358 m · 4.9 MW
- Mobistar Nossegem fka Versatel Nossegem 386 m
- AtlasEdge DC Brussels BRU001 458 m · 8.5 MW
- EXA Edge DC Zaventem 792 m
- Digital Realty BRU1 - Brussels 1.7 km · 9.6 MW
- brusselsdc 3.3 km · 1.3 MW
- LCL Brussels (Diegem) 3.4 km
- MCI/Verizon Brussels (Diegem) E 3.6 km
More Unix-Solutions data centers
- Unix-Solutions DC Leuven Belgium
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.