Data Center Directory

Azertelecom

Azertelecom is an operational data center operated by Azertelecom in Baku, Azerbaijan. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorAzertelecom
Networks2 networks
PeeringDB.
Also known asAZRT Datacenter Baku
Address106A Haydar Aliyev ave.
Coordinates40.41675, 49.90937
Websiteazertelecom.az

Power and grid

Nearest high-voltage substationKürdəxanı Elektrik Yarımstansiyası, 220 kV, 10 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km2.2 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity631 g CO₂ per kWh (Azerbaijan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 87.4%, hydro 10.1%, solar 1.6%. Clean power: 12.3%

Climate and water

Average temperature15.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.3 °C (2001 to 2025)
Cooling degree days822 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.07 kWh per m² per day
Wind at 50 m6.6 m/s average
Water stress todayMedium - High (20-40%) (Azerbaijan)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Azertelecom to the power grid?

The nearest high-voltage substation in OpenStreetMap is Kürdəxanı Elektrik Yarımstansiyası (220 kV), about 10 km away.

How clean is the power for Azertelecom?

The grid in Azerbaijan emits about 631 g CO₂ per kWh (2025). Largest sources: gas 87.4%, hydro 10.1%, solar 1.6%.

Who operates Azertelecom?

Azertelecom.

Data centers near Baku

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.