Delta Telecom
Delta Telecom is an operational data center operated by Delta Telecom in Baku, Azerbaijan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Delta Telecom |
| Networks | 7 networks PeeringDB. |
| Address | 69 Muzaffar Hasanov |
| Coordinates | 40.40519, 49.80012 |
| Website | delta-telecom.net |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 3.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Badamdar Elektrik Stansiyası, 220 kV, 5.9 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 2.3 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 631 g CO₂ per kWh (Azerbaijan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 87.4%, hydro 10.1%, solar 1.6%. Clean power: 12.3% |
Climate and water
| Average temperature | 15.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 822 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.07 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Azerbaijan) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Delta Telecom to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 3.4 km away.
How clean is the power for Delta Telecom?
The grid in Azerbaijan emits about 631 g CO₂ per kWh (2025). Largest sources: gas 87.4%, hydro 10.1%, solar 1.6%.
Who operates Delta Telecom?
Delta Telecom.
Data centers near Baku
- Aztelekom Datacenter 745 m
- Pasha Technology Datacenter 2.9 km · 2.7 MW
- Pasha Baku DC1 3.1 km
- BMDC 3.1 km
- Zone 41 8.0 km
- Azertelecom 9.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.