BMDC
BMDC is an operational data center operated by PASHA TECHOLOGY in Baku, Azerbaijan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | PASHA TECHOLOGY |
| Networks | 1 networks PeeringDB. |
| Address | 157, Azadlyq Avenue |
| Coordinates | 40.41464, 49.83503 |
| Website | pasha-technology.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 4.7 km away (Biləcəri Azərişıq Yarımstansiyası) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Badamdar Elektrik Stansiyası, 220 kV, 7.5 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 2.3 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 631 g CO₂ per kWh (Azerbaijan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 87.4%, hydro 10.1%, solar 1.6%. Clean power: 12.3% |
Climate and water
| Average temperature | 15.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 822 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.07 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Azerbaijan) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is BMDC to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 4.7 km away.
How clean is the power for BMDC?
The grid in Azerbaijan emits about 631 g CO₂ per kWh (2025). Largest sources: gas 87.4%, hydro 10.1%, solar 1.6%.
Who operates BMDC?
PASHA TECHOLOGY.
Data centers near Baku
- Pasha Baku DC1 257 m
- Pasha Technology Datacenter 582 m · 2.7 MW
- Aztelekom Datacenter 2.7 km
- Delta Telecom 3.1 km
- Zone 41 6.0 km
- Azertelecom 6.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.