BESTNAP
BESTNAP is an operational data center operated by Bestline Communications, L.P. in Austin, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Bestline Communications, L.P. |
| Address | 1122 Colorado Street |
| Coordinates | 30.27354, -97.74294 |
| Website | bestline.net |
Power and grid
| Utility | Austin Energy (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Houston Pipeline Co, intrastate pipeline, 2.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 1,779 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for BESTNAP?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates BESTNAP?
Bestline Communications, L.P..
Data centers near Austin
- 1011 San Jacinto 470 m
- Dell Rattler 608 m · 0.2 MW
- Lumen Austin 3 2.3 km · 0.8 MW
- Alpheus Austin (1905 E. 6th Street) 2.4 km · 4.9 MW
- LightEdge Austin 1 (AUS1) 7.2 km · 5.3 MW
- Data Foundry Austin 1 7.9 km · 9.1 MW
- Digital Realty AUS11 - Austin 8.2 km · 19 MW
- Cogent Austin 8.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.