Cogent Austin
Cogent Austin is an operational data center operated by Cogent Communications in Austin, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cogent Communications |
| Networks | 1 networks PeeringDB. |
| Address | 7301 Metro Center Drive |
| Coordinates | 30.20923, -97.69797 |
| Website | cogentco.com/en/cogent-austin |
Power and grid
| Utility | Austin Energy (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Houston Pipeline Co, intrastate pipeline, 300 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 1,858 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Cogent Austin?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Cogent Austin?
Cogent Communications.
Data centers near Austin
- CyrusOne Austin (Met 3) 351 m · 6 MW
- CyrusOne Austin (Met 2) 368 m · 2.7 MW
- Digital Realty AUS11 - Austin 390 m · 19 MW
- Data Foundry Austin 1 726 m · 9.1 MW
- LightEdge Austin 2 (AUS2) 1.3 km · 18 MW
- LightEdge Austin 1 (AUS1) 1.5 km · 5.3 MW
- Data Foundry Texas 1 1.9 km · 27 MW
- Lumen Austin 1 2.0 km · 22 MW
More Cogent Communications data centers
- Cogent Elkridge United States
- Cogent Data Center United States
- Cogent Dijon France
- Cogent Toulouse France
- Cogent Tours France
- Cogent Lille France
- Cogent Rouen France
- Omaha Switch United States