Data Center Directory

CyrusOne Austin (Met 3)

CyrusOne Austin (Met 3) is an operational data center operated by CyrusOne in Austin, United States. Our footprint estimate of its power is about 6 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power6 MW (range 2.4 MW to 15 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 49,606 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks, 1 internet exchanges
PeeringDB.
Address7100 Metropolis Blvd
Coordinates30.20711, -97.70067
Websitecyrusone.com

Power and grid

Nearest high-voltage substationMet Center Substation, 138 kV, 800 m away (Austin Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationTesla Battery Substation, 345 kV, 8.6 km away
HV substations within 10 km24
UtilityAustin Energy (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineHouston Pipeline Co, intrastate pipeline, 100 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.1 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature20.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.6 °C (2001 to 2025)
Cooling degree days1,858 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.81 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne Austin (Met 3) use?

We estimate the facility power at about 6 MW. Estimate from building footprint, low confidence.

How close is CyrusOne Austin (Met 3) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Met Center Substation (138 kV), about 800 m away. The local utility is Austin Energy, in the ERCO balancing area.

How clean is the power for CyrusOne Austin (Met 3)?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates CyrusOne Austin (Met 3)?

CyrusOne.

Data centers near Austin

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.