CyrusOne Austin (Met 3)
CyrusOne Austin (Met 3) is an operational data center operated by CyrusOne in Austin, United States. Our footprint estimate of its power is about 6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 6 MW (range 2.4 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 49,606 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Address | 7100 Metropolis Blvd |
| Coordinates | 30.20711, -97.70067 |
| Website | cyrusone.com |
Power and grid
| Nearest high-voltage substation | Met Center Substation, 138 kV, 800 m away (Austin Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Tesla Battery Substation, 345 kV, 8.6 km away |
| HV substations within 10 km | 24 |
| Utility | Austin Energy (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Houston Pipeline Co, intrastate pipeline, 100 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.1 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 1,858 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne Austin (Met 3) use?
We estimate the facility power at about 6 MW. Estimate from building footprint, low confidence.
How close is CyrusOne Austin (Met 3) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Met Center Substation (138 kV), about 800 m away. The local utility is Austin Energy, in the ERCO balancing area.
How clean is the power for CyrusOne Austin (Met 3)?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates CyrusOne Austin (Met 3)?
CyrusOne.
Data centers near Austin
- CyrusOne Austin (Met 2) 296 m · 2.7 MW
- Cogent Austin 351 m
- Digital Realty AUS11 - Austin 734 m · 19 MW
- LightEdge Austin 2 (AUS2) 941 m · 18 MW
- Data Foundry Austin 1 1.1 km · 9.1 MW
- LightEdge Austin 1 (AUS1) 1.4 km · 5.3 MW
- Data Foundry Texas 1 1.5 km · 27 MW
- Lumen Austin 1 1.6 km · 22 MW
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.