Bloomberg Data Center is an operational data center operated by Bloomberg in Orangeburg, United States. Our footprint estimate of its power is about 31 MW.

Key facts

StatusOperational
OperatorBloomberg
Facility power31 MW (range 16 MW to 50 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 25,950 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 13,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCorporate Drive 155, 10962, Orangeburg
Coordinates41.03619, -73.98763

Power and grid

UtilityOrange & Rockland Utils INC (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityNYIS
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 1.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity268 g CO₂ per kWh (New York, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9%
Industrial power priceUSD 0.105 per kWh (New York, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days504 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.87 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayLow - Medium (10-20%) (New York)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Bloomberg Data Center use?

We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.

How clean is the power for Bloomberg Data Center?

The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.

Who operates Bloomberg Data Center?

Bloomberg.

Data centers near Orangeburg

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.