ColoHouse New York
ColoHouse New York is an operational data center operated by ColoHouse Premier Datacenter in Orangeburg, United States. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ColoHouse Premier Datacenter |
| Facility power | 16 MW (range 8.1 MW to 26 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,480 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | ORNY1 · fifteenfortyseven CSR ORNY1 |
| Address | 1 Ramland Rd |
| Coordinates | 41.03451, -73.97584 |
| Website | colohouse.com |
Power and grid
| Nearest high-voltage substation | Corporate Drive Substation, 138 kV, 1.1 km away (Orange & Rockland) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hillsdale Substation, 230 kV, 6.6 km away |
| HV substations within 10 km | 7 |
| Utility | Orange & Rockland Utils INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | NYIS |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 2.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 15 GW in 94 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ColoHouse New York use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
How close is ColoHouse New York to the power grid?
The nearest high-voltage substation in OpenStreetMap is Corporate Drive Substation (138 kV), about 1.1 km away. The local utility is Orange & Rockland Utils INC, in the NYIS balancing area.
How clean is the power for ColoHouse New York?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates ColoHouse New York?
ColoHouse Premier Datacenter.
Data centers near Orangeburg
- Bloomberg Data Center 1.0 km · 31 MW
- Databank Orangeburg (LGA3) 1.3 km · 21 MW
- Data center in Orangeburg 2.0 km · 32 MW
- Data center in Yonkers 11.3 km · 2.3 MW
- TierPoint Hawthorne (fka Xand) 14.7 km
- NYSE Data Center 15.6 km · 18 MW
- Crown Castle White Plains (360 Hamilton) 17.5 km
- WhiteLabelITSolutions 17.9 km