Data Center Directory

BR.Digital Campo Grande (CPE1)

BR.Digital Campo Grande (CPE1) is an operational data center operated by BR.Digital in Campo Grande, Brazil. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorBR.Digital
Networks1 networks, 1 internet exchanges
PeeringDB.
Address627 Avenida Noroeste
Coordinates-20.45974, -54.62644
Websitebr.digital

Power and grid

Nearest high-voltage substationSubestação Campo Grande Centro, 138 kV, 600 m away (Energisa)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestação Campo Grande 2, 230 kV, 14.2 km away
HV substations within 10 km8
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature23.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.5 °C (2001 to 2025)
Cooling degree days2,079 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.22 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayLow (<10%) (Mato Grosso do Sul)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is BR.Digital Campo Grande (CPE1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Campo Grande Centro (138 kV), about 600 m away.

How clean is the power for BR.Digital Campo Grande (CPE1)?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates BR.Digital Campo Grande (CPE1)?

BR.Digital.

Data centers near Campo Grande

More BR.Digital data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.