Data Center Directory

BR.Digital Caruaru (CRU1)

BR.Digital Caruaru (CRU1) is an operational data center operated by BR.Digital in Caruaru, Brazil. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorBR.Digital
Networks2 networks, 1 internet exchanges
PeeringDB.
AddressAv. Bom Pastor, 246 - Petrópolis
Coordinates-8.29971, -35.97465
Websitebr.digital

Power and grid

Nearest high-voltage substationSubestação Tacaimbó, 230 kV, 27.6 km away (Companhia Hidro Elétrica do São Francisco)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km26 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature23 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.5 °C (2001 to 2025)
Cooling degree days2,147 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.35 kWh per m² per day
Wind at 50 m6.6 m/s average
Water stress todayLow - Medium (10-20%) (Pernambuco)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is BR.Digital Caruaru (CRU1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Tacaimbó (230 kV), about 27.6 km away.

How clean is the power for BR.Digital Caruaru (CRU1)?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates BR.Digital Caruaru (CRU1)?

BR.Digital.

Data centers near Caruaru

More BR.Digital data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.