BR.Digital Cuiabá (CBA1)
BR.Digital Cuiabá (CBA1) is an operational data center operated by BR.Digital in Cuiabá, Brazil. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | BR.Digital |
| Networks | 2 networks, 1 internet exchanges PeeringDB. |
| Address | Av. Dr. Meirelles, 325 - Tijucal |
| Coordinates | -15.63731, -56.02493 |
| Website | br.digital |
Power and grid
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 26.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 3,181 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.15 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Mato Grosso) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for BR.Digital Cuiabá (CBA1)?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates BR.Digital Cuiabá (CBA1)?
BR.Digital.
Data centers near Cuiabá
- BR.Digital Cuiabá (CBA2) 9.1 km
- PIX MTI 9.5 km
- Titania Cuiabá (Brasil TecPar) 9.6 km
- CDL 94.8 km
More BR.Digital data centers
- BR.Digital Brasília (BSA1) Brazil
- BR.Digital Brasília (BSA2) Brazil
- BR.Digital Campo Grande (CPE1) Brazil
- BR.Digital Caruaru (CRU1) Brazil
- BR.Digital Caxias do Sul (CSL1) Brazil
- BR.Digital Cuiabá (CBA2) Brazil
- BR.Digital Curitiba (CTA1) Brazil
- BR.Digital Florianópolis (FNS1) Brazil
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.