Capital Outsourcing Beirut
Capital Outsourcing Beirut is an operational data center operated by CAPITAL OUTSOURCING SAL in Beirut, Lebanon. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CAPITAL OUTSOURCING SAL |
| Address | Achrafieh-Charles Malek Avenue-Hadifeh building |
| Coordinates | 33.89222, 35.51422 |
| Website | c-o.com/cloud-services/co-location-services |
Power and grid
| Grid carbon intensity | 391 g CO₂ per kWh (Lebanon, 2024) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | oil and other fossil 56.7%, solar 29.4%, hydro 13.2%, bioenergy 0.6%. Clean power: 43.3% |
Climate and water
| Average temperature | 19.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 1,164 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.21 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | NoData (Beirut) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Capital Outsourcing Beirut?
The grid in Lebanon emits about 391 g CO₂ per kWh (2024). Largest sources: oil and other fossil 56.7%, solar 29.4%, hydro 13.2%.
Who operates Capital Outsourcing Beirut?
CAPITAL OUTSOURCING SAL.
Data centers near Beirut
- مايكروسوفت لبنان 1.5 km · 1.9 MW
- God Of Mining 5.3 km
- Berytech Technological Pole 5.4 km
- مركز خدمات لشركة ارامكس 84.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.