مايكروسوفت لبنان
مايكروسوفت لبنان is an operational data center operated by Microsoft in Beirut, Lebanon. Our footprint estimate of its power is about 1.9 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 1.9 MW (range 1 MW to 3.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,596 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 810 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | جادة الأفرنسيين |
| Coordinates | 33.90080, 35.50208 |
Power and grid
| Grid carbon intensity | 391 g CO₂ per kWh (Lebanon, 2024) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | oil and other fossil 56.7%, solar 29.4%, hydro 13.2%, bioenergy 0.6%. Clean power: 43.3% |
Climate and water
| Average temperature | 19.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 1,164 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.21 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | NoData (Beirut) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does مايكروسوفت لبنان use?
We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.
What chips does مايكروسوفت لبنان use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for مايكروسوفت لبنان?
The grid in Lebanon emits about 391 g CO₂ per kWh (2024). Largest sources: oil and other fossil 56.7%, solar 29.4%, hydro 13.2%.
Who operates مايكروسوفت لبنان?
Microsoft.
Data centers near Beirut
- Capital Outsourcing Beirut 1.5 km
- God Of Mining 6.6 km
- Berytech Technological Pole 6.8 km
- مركز خدمات لشركة ارامكس 85.5 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.