Data Center Directory

God Of Mining

God Of Mining is an operational data center in Beirut, Lebanon. No power figure is public for this site yet.

Key facts

StatusOperational
Coordinates33.88486, 35.57125
Websitegodofmining.net

Power and grid

Nearest high-voltage substationSubstation Bsalim, 220 kV, 2.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km1.6 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity391 g CO₂ per kWh (Lebanon, 2024)
Average of all power made in the area. Ember.
Grid power mixoil and other fossil 56.7%, solar 29.4%, hydro 13.2%, bioenergy 0.6%. Clean power: 43.3%

Climate and water

Average temperature19.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days1,164 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.21 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayExtremely High (>80%) (Mount Lebanon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How close is God Of Mining to the power grid?

The nearest high-voltage substation in OpenStreetMap is Substation Bsalim (220 kV), about 2.9 km away.

How clean is the power for God Of Mining?

The grid in Lebanon emits about 391 g CO₂ per kWh (2024). Largest sources: oil and other fossil 56.7%, solar 29.4%, hydro 13.2%.

Data centers near Beirut

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.