Data Center Directory

Celeste Fil d’Ariane

Celeste Fil d’Ariane is an operational data center operated by Celeste in Albi, France. Our footprint estimate of its power is about 6 MW.

Key facts

StatusOperational
OperatorCeleste
Facility power6 MW (range 3 MW to 9.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,014 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asFil d'Ariane
Address1 Rue Pierre gilles de Gennes
Coordinates43.91945, 2.18274
Websiteceleste.fr/hebergement-et-service-cloud/datacenter-fil-dariane

Power and grid

Nearest high-voltage substationPélissier, 225 kV, 5.3 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km310 MW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.5 °C (2001 to 2025)
Cooling degree days385 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.84 kWh per m² per day
Wind at 50 m5.8 m/s average
Water stress todayLow - Medium (10-20%) (Occitanie)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Celeste Fil d’Ariane use?

We estimate the facility power at about 6 MW. Estimate from building footprint, low confidence.

How close is Celeste Fil d’Ariane to the power grid?

The nearest high-voltage substation in OpenStreetMap is Pélissier (225 kV), about 5.3 km away.

How clean is the power for Celeste Fil d’Ariane?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Celeste Fil d’Ariane?

Celeste.

Data centers near Albi

More Celeste data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.